A Delivered Tower in an Open Cluster
E11EVEN Club Hotel & Residences stands in Park West, Miami. The project record marks it Now Open and stamps the page verified on 24 October 2026. It lists 456 residences across 65 floors, a start date of 11 November 2021 and completion in June 2026.
The milestones date the delivery. Tower One topped out in February 2025 at about 700 feet. Closings began on 6 March 2026. The Real Deal reported about 400 deeds recorded by 22 June 2026. Residents were closing and moving in.
A coach route through this block gains one address and keeps three properties that already trade within 0.3 mi of it.
What the Record Gives a Driver
The record publishes coordinates: 25.7844779 latitude and -80.193593 longitude. It publishes the locality as Miami. A driver loads those coordinates and calls the property for the gate.
Confirm the curb at every stop. The record carries no loading bay, no coach set-down and no permit window for any of the four properties. Each one becomes a call to the property and, where the city requires one, a permit application.
Drop-Off Order Across Four Open Properties
Take the tower first. Miami World Tower 1 sits 0.2 mi away and trades, dated 2024. Miami Worldcenter and The Crosby Miami Worldcenter each sit 0.3 mi away, dated May 2025 and 2025.
Four stops sit inside 0.3 mi of the first drop. Hand the driver the four addresses with the measured distances, and ask each property for the one-way pattern its block uses.
What the Amenities Still Owe a Group
The record describes a 65-story dual-tower condo-hotel with studio to two-bedroom units and penthouse collections. It names three amenities: a rooftop pool, a Chopra Spa and a nightlife venue. It publishes no date for the hotel component and no key count.
The June 2026 milestone adds one line. Hotel and day-club components phase in toward year-end. The residences are occupied and the tower is complete.
Tell clients that much and hold the evening stop against a written commissioning date. Keep a second venue on the route for the nights before that date lands.
Every dated milestone names Tower One. The description calls the project a dual-tower build. A second tower would add residents to the same block, so hold the drop-off plan as a working document for next year.
Construction on the Same Approaches
Five properties inside half a mile are under construction. JEM Private Residences sits at 0.1 mi for Q4 2027. Legacy Hotel & Residences sits under 0.1 mi with no date published. One West Twelve Residences sits at 0.2 mi for 2028, 14 ROC at 0.3 mi for 2028, and Waldorf Astoria Residences Miami at 0.5 mi for Q2 2028.
Two more are announced: Palm Tree Residences Miami under 0.1 mi for 2030 and Delano Residences Miami at 0.5 mi for 2031.
Each site puts construction vehicles on the approaches a coach uses. Build ten minutes of slack into every leg inside the half-mile ring. Check the city road closures for the travel dates before the manifest goes to print.
Rehearse the Route Before the First Departure
Drive it once, empty, on the day of the week the tour runs. Time the leg from the first drop to the last, and note where the coach stands while passengers load.
Print four items on the manifest: the coordinates, the drop order, a curb contact for each stop and the venue's commissioning date. Give the driver the fallback venue as well.